R.M.S. Queen Elizabeth 2 back
Type of vessel: Passenger ship
Built: 1969
Shipyard: Upper Clyde Shipbuilders Ltd., Clydebank
Weight: 70.327 BRZ
Client: Cunard Line Ltd., Southampton
Link: www.cunardline.com
Picture
 
Work carried out at Lloyd Werft:
 
04|24 - 05|07|2006
  • General maintenance of engines
  • Several repairs to pipe systems
  • Several steel repairs on ships hull and in tanks
  • Dock work like overhauling of propellers, stabilisators and bowthrusters
  • Painting of ships hull and tanks
  • Overhauling of life saving applliances
 
05|02 - 05|20|2004
  • 2 years surveys and repairs
  • Change of propellerblades P/S
  • Repair work at the boiler system
  • Overhauling of bowthrusters
  • Tank cleaning and painting
  • Steel work in tanks and on decks
  • Installation of a water mist system in the engine room
  • Maintenance at the life boats and davits
  • Paint work in UW area and ship’s hull
  • Upgrading of the entire teak wood decks
  • Installation of a new service area on one deck
  • Refurnishing of pax areas, as
    • Penthousealleways and staircases
    • Restaurant Mauretania & Britannia
    • Queen Room & Promenade
    • Yacht Club
    • Upgrading of bath rooms
    • Upgrading of public toilets
 
11|21 - 12|7|2001
  • 2 yaers survey and repairs
  • propulsion e-motors service
  • Cleaning and couting of sundry tanks and steal repairs
  • Underwatership hydro-blasting and coating
  • Change of propeller-blades
  • 9 EGES-service and repair
  • Change of halon to CO-2 System
  • Refurbishment of public spaces
 
11|13|1999 - 12|9|1999
  • Renovation of public areas.
  • Refurbishing of suites, standard cabines and restaurants.
  • New hull color painting.
 
06|23. - 06|31|1988
  • Drydocking, repairs and maintenance work.
  • Conversions of central installation and passenger accomodation.

 

10|26|1986 - 04|25|1987
  • General conversion.
  • Exchange of the steam turbine engine for a highly mordern diesel-electric propulsion plant with an output of 95,625 KW (130,000 H.P.).
  • Fundamental conversion of public areas, passenger accomodation, laundries, galley equipment most significantly to the penthouse suites on the sports and signal decks.
  • Eight supplemantary penthouse suites on the signal deck.
  • Re-design of the shopping area.

 

12|02 - 12|14|1984
  • Drydocking, repairs and maintenance work

 

11|28 - 12|12|1983
  • Drydocking, repairs and maintenance work, small conversion works.